Long work session in the garage. Brakes was the word of the day, as in brake ducts.
We started with standard ABS type plastic ducts that we were going to afix to the outside of the bumper and duct in. But that didn't look that good and we were worried about airflow.
Openings in the bumper got enlarged and then we used the heat gun to deform the ducts after we'd cut the flange off of them making something like this.
These had a straight shot at the inside duct and sway bar where we wanted to attach the ductwork.
Now, while all of that looks simple it took a couple of hours. Before all of that started I got the front suspension installed, nut and bolted, and tidied up for front bumper final install. As well as did some wiring.
Once we figured out where the ducts were going we were able to run hose.
Bookmarks