Results 1 to 14 of 14

Thread: Construction @ VIR

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Jul 2005
    Location
    kannapolis,nc,usa
    Posts
    38

    Default

    Hey all talked a security guard at the Rolex weekend, he said the lower level (track) is going to be weightroom, next level (grid) garage space, top level condos. He said same thing as everybody else, it's a terrible location, and is not going to make life easy for control or timing to see turn 17.

    racerb

  2. #2
    Join Date
    Dec 2001
    Location
    raleigh, nc, usa
    Posts
    5,252

    Default

    AND, the River is down there!
    NC Region
    1980 ITS Triumph TR8

  3. #3
    Join Date
    Feb 2002
    Location
    Charlotte, NC
    Posts
    128

    Default

    Originally posted by racerb@Oct 26 2005, 01:33 AM
    Hey all talked a security guard at the Rolex weekend, he said the lower level (track) is going to be weightroom, next level (grid) garage space, top level condos. He said same thing as everybody else, it's a terrible location, and is not going to make life easy for control or timing to see turn 17.

    racerb
    Wouldn't it only be like 5 or 6 units long? And was it just an optical illusion looking at the doorways between walls or were there door openings at the pit level which I'd presume would open out to the pits?
    Adam in Charlotte
    #42 ITA CRX Si

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •