Originally posted by GregAmy:
This management capability became most critical during the initial discussion phase of this protest. Jake noted, "We left the meeting assured that the tools would be available and that a proper teardown location had been arranged." This was the initial failure point with the system. It was the responsibility of the Chief Scrutineer to verify that these tools and skills were, indeed, available; if they were not then it fell upon him to arrange suitable post-event inspection. This, apparently, did not happen.
Bookmarks